Moisture can often destroy a perfect laminate floor installation so before you begin it is very.
Laying locking laminate flooring.
They should acclimate for at least 48 hours.
Raise the outside edge of the plank upward approximately 1.
If you place laminate flooring on a weak or uneven sub floor the new floor will be compromised and eventually buckle damage the laminate locking system creak or create micro gaps in the new floor.
To cut the flooring lay the board on its face bottom up and cut with a saw equipped with a fine tooth blade for flooring.
Lay out the unopened boxes of laminate planks in the room.
In this video i am showing how to install laminate flooring for the first time.
Here are some ways you can check for problems in a sub floor.
Lay moisture barrier thoroughly clean the subfloor so that there is no debris on the floor and that it is flat and smooth.
Never hammer laminate boards.
Directly onto the subfloor lay down a layer of plastic sheeting to create a moisture barrier.
Place unopened packages of laminate flooring in the room or rooms in which they are to be installed.
How to install laminate flooring.
Nail baseboards and molding to wall not to laminate.
Save the trimmed sections because you can use these pieces to start other rows.
If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
Join boards by inserting tongue into groove and pushing down until boards lock together.
Repeat previous steps to complete installation.
This will allow them to acclimate to the room s temperature and humidity.
Rotate downward on the plank until the joint locks image 3.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels.
This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity.