Lay a 8 to 10 foot piece of lumber on the concrete floor.
Laying laminate flooring on uneven concrete.
Fixing an uneven floor for laying laminate b efore laying your laminate flooring it is essential to ensure that your subfloor is even.
Position yourself in a way that allows you to see the board more or less from the side and look for low areas that show up in relation to.
Laying laminate flooring on uneven concrete can cause buckling and loose boars as the floor settles into its new installation.
Here is some useful information on the process.
Leave the flooring in the room for three days before installation.
Bill oxford istock gettyimages laying laminate flooring on uneven concrete can cause buckling and loose boars as the floor settles into its new installation.
Use a concrete grinder to remove any oil adhesive or paint from the floor before gluing down laminate then sweep and vacuum up any debris.
If your concrete passes the moisture test then plastic sheeting at least 6 mils thick will prevent moisture from getting into your laminate flooring.
You do not need to remove oil adhesive or paint for floating laminate though you should sweep the floor.
The four layers that make up laminate flooring is the top wear layer the design layer the inner core and the backing.
Underlay will not hide major flaws and a floor that is uneven will need attention before you lay any laminate flooring.
Then place the pad and get ready to install your laminate flooring.
Place the laminate flooring on the concrete slab in the room where it is to be installed.
After installing the moisture barrier select the thickest pad you can get to help level out the floor even more.
Laying laminate flooring on concrete requires calculating the required amount of laminated boards choosing a substrate beneath it as well as some acquired tools for its installation.
Laminate floors are made using a layered synthetic composite construction of four main materials.
Where plastic sheets must be joined overlap the sheets by several inches and use strong vinyl tape to secure them.
If you re on a concrete subfloor you will need to lay down a moisture barrier before applying the pad.
Install a plastic vapor barrier.
Only very small imperfections can be concealed using underlay.
Laying laminate flooring on concrete floor level in your house or apartment.
This will help to acclimate the flooring to the room temperatures and humidity.
Once you ve leveled your floor you can install the laminate pad.