Lay laminate flooring on the rest of the concrete floor in the same manner described above.
Laying laminate flooring on concrete floor.
Laying laminate flooring on uneven concrete can lead to problems.
They should acclimate for at least 48 hours.
In colorado dry basement built 1961.
You ll also want to tear up any carpet in the room and remove the leftover tack strips.
Work with patience and make sure you don t leave any gaps between the laminate planks.
How to install laminate flooring over concrete important.
Before you install file flooring follow the directions above for fixing high spots and low spots in a wood or concrete subfloor.
Multiply length times width of the room.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
There are also tiles missing here and there.
Before the installation itself leave laminate boards in the room for some time.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
Make a final check with the level to be sure all the high and low spots are gone.
My contractor wants to install laminate on top of floor.
Many types of flooring can be installed over a concrete sub floor.
Laminate flooring is a good alternative to wood flooring in basements.
Determine how much flooring and materials will be needed.
This will allow them to acclimate to the room s temperature and humidity.
However many homeowners are disappointed to discover that solid wood flooring cannot be installed on a concrete slab.
Add about 10 to that number to account for any possible mistakes and warped boards.
Remove any carpet or other flooring.
The previous owner put the really old style tiles on top of concrete.
When installing a laminate floor on top of old tile on top of concrete basement floor.
To lay laminate flooring first clear out any furniture in the room you ll be laying the floor in.
Laminate flooring is also fairly easy to install.
Work with patience and make sure you don t leave any gaps between the laminate planks.
If you lay the laminated flooring on new concrete floors you must know that the period of the complete drying is about 80 days.
Lay out the unopened boxes of laminate planks in the room.
Next cut strips of underlayment to size and lay the strips down across the exposed floor.
Then vacuum the floor with a wet dry vac or sweep it with a broom.