You will lay the flooring lengthwise to this wall.
Laying hardwood laminate on concrete.
Place the laminate flooring on the concrete slab in the room where it is to be installed.
Old basement slabs can crack and buckle in places.
When installing around a doorway slide the plank at least 1 4 inch under the door frame leaving a concealed 3 8 inch expansion gap.
When possible always begin layout or installation from the straightest wall generally an outside wall.
Laying laminate flooring on concrete laying laminate flooring on concrete floor level in your house or apartment.
Snap the chalk line over the top of the concrete or moisture barrier between the marks on opposite walls making a cross in the center of the room.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Position yourself in a way that allows you to see the board more or less from the side and look for low areas that show up in relation to.
Whether you re planning on renting out your home or looking to increase its value using concrete as a base is a great idea.
When you install hardwood floors concrete is one of the best bases to work from there are only a few steps to take.
Lay a 8 to 10 foot piece of lumber on the concrete floor.
Determine your starting wall.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Laying laminate flooring over concrete can look great and last for many years when installation factors involving the characteristics of concrete are addressed.
Leave the flooring in the room for three days before installation.
The challenges of laying laminate on concrete for long term performance your laminate wood floor needs to be dry level and clean.
When installing a basement hardwood floor the concrete must be flat so the tongue and grooves of the hardwood meet and connect.
These are the challenges.
You need to fill any large cracks and be sure that the entire floor is level.
Install the plywood after the vapor retarder is in place.
Puncture bubbles to release trapped air.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Lay 4 to 6 mil polyethylene film over the slab overlapping the edges 4 to 6.
In either case roll the film flat or walk it in stepping on every square foot to ensure adhesion.
Follow these steps with care to safely complete the installation yourself.
Laying laminate flooring on concrete requires calculating the required amount of laminated boards choosing a substrate beneath it as well as some acquired tools for its installation.